OVERHEAD PIPE BRIDGE, 100 METRE APPROX. 10 BOX STEEL UPRIGHTS, 5-6 METRE CLEARANCE 3 TIER PIPE CAPACITY GALVANISED, 200 x 200mm UPRIGHTS WITH LIGHTS (CABALLING & CAMERA NOT INCLUDED)
THIS LOT MUST BE REMOVED BY THE DESIGNATED CONTRACTOR AT AN ADDITIONAL EXPENSE TO THE BUYER, CONTACT DEYOUNG SALVAGE, TROY 0409 691 036