We've detected that your browser is not JavaScript enabled which may diminish your user experience.

See Also:
- Auctions
- Previous
- Search
- For Sale

New Accommodation Buildings

This is a past auction. Click here for current auctions
Thursday 21st April 2016 at 11:00 AM
Location: 142 Churchill Rd North, CAVAN SA 5094  View Map
Under Instructions: from a third party Olympic Dam mining identity
Fees: A Buyers Premium of 8.80% Will Apply, Sale is GST Inclusive
Enquiries: Andrew Maros 0418 845 884 andrewm@mgs.net.au
Live Auction Webcast: https://www.interbid.com.au/mgs
Summary
Photos
Catalogue
Print Catalogue
 

48 CIMC Relocatable Accommodation Units, Self Contained Services, Never Installed


All Buildings to be sold on an Individual Basis

Units Comprising
- 23 x 4 Bedroom Upper Level Units
- 22 x 4 Bedroom Ground Level Units
- 1 x 3 Bedroom With Store/Comms Area Unit
- 2 x 2 Bedroom/Disabled Ground Level Unit
- 1 x Laundry Split Room Open Plan Unit

Building Dimensions
- 15.15m x 4.45m Including services frame containing hot water services, air conditioner units & switch gear. 
- All buildings have category rating to suit an A1 Region. 

Accommodation Building Contents (2, 3 & 4 Room) 
- Air Conditioning - Daikin Inverter, Heat Pump Outdoor Unit, Model RXS25KVMA. Indoor Unit, Model FTXS25KVMA 
- Hot Water Service - Rheem MPi-325 Integrated Heat Pump, Electric, 325 Litre, Model 55132505 
- Fridge - Haier 130 Litre, Model HBF130W 

- Each Room Also Features: 100% Block Out Blinds, Cordless Kettle, King Single Ensemble Bed & Mattress, Bedside 3 Drawer Mobile Unit, Fixed Shelf Unit, 2 Door Lockable Storage Cupboard, Desk, Black Mesh Chair, Ensuite comprising Imperial Ware Ceramic 4 Star Water Rating Dual Flush Toilet, 2 Door Lockable Ceramic Vanity, Glass Door Shower, Tiled Ensuite Floor, Rooms Wired for Voice & Data, 4 x Double Power Outlets (10 Amp), 1 x Single Power Outlet (10 Amp), Hard Wired Smoke Detector. 

Australian Standards 
The following Australian Standards have been used in the checking of buildings 

- AS/NXS1170.0:2002 Structural Design Actions 
- AS/NZS1170.1:2002 Permanent, imposed & other actions 
- AS/NZS1170.2:2011 Wind Load Actions 
- AS1170.4:2007 Earthquake Load Actions 
- AS4100-1998 Steel Structures 
- AS/NZS4600:2005 Cold Formed Structures 

Salvage
Bulk Two Storey Fixtures (Break Bulk) to include
- Stair Cases, Platforms, Walkways, Fasteners, Structural Fixtures (To Be Sold in Bulk Lots)

Auction Conditions 
- Enclosed footwear must be worn. Persons under the age of 16 will not be allowed onsite.
- Any such contractors will wear at all times any prescribed safety equipment (PPE).
- Within 24 hours a $5,000 deposit must be received by MGS with full balance to be paid by no later than Friday 29th April 2016. 

Removal and Loading
- Organised times will be allocated to each building for site delivery (This will keep loading costs to a minimum for each buyer).
- A selected approved vendor contractor will be available for quotation for both loading and/or transport.
- The buyer can utilise our selected transport contractors or provide their own subject to the conditions laid out by the crane contractor.
- All costs involved in the removal of assets are at the purchasers expense. All loading funds to be paid prior to loading of units.
- Loadout of 4 buildings per day (morning and afternoon time slots available) (with the exception of inclement weather).

Loading Costs - Churchill Rd North
- $1,650 will be invoiced to the purchaser per building to cover crane operator and rigger authorised by third party mining contractors, approved by vendor.
- This will be paid with invoice upon settlement.    

Loading Dates are as follows
Week 1 - Tues 3rd May, Weds 4th May, Thurs 5th May
Week 2 - Tues 10th May, Wed 11th May, Thurs 12th May
Week 3 - Tues 17th May, Wed 18th May, Thurs 19th May, Fri 20th May
Week 4 - Tues 24th May

Transport Beams:
Sets of 5 will be available for sale at cost of $950 per set if required. Please allow at least 5 working days for delivery.

Salvage - Break Bulk Collection (Lots 50-126):
Collection available from Tuesday 26th April - Friday 29th April (times and loading costs TBA)

Notes

- Buildings Upper or Ground Level Can Be Installed as Stand Alone Units or Constructed in the Proposed 2 Level Format.